top of page
Site from west.jpg

PROJECTS

808 ON ALDER

The Central Eastside Industrial District is a growing hub of innovation in the heart of Portland. 808 On Alder fulfills a drastically under-served market for wet biotech lab incubator space in the metro area, serving emerging health sciences and technology industries. The design will transform a two-story, concrete and wood-frame warehouse into 34,984 square feet of private, biotech-focused research wet laboratory space, along with a new penthouse for creative offices. Along with other sustainable design features including high-efficiency mechanical/electrical systems, the building is capped with an eco-roof, helping control building temperature while preventing excess storm-water runoff. 

Delivery Q1 2021.

LOCATION

Portland, OR

CATEGORY

Life Sciences

LEASE INFO -Josh Bean ETHOS Commercial Advisors    

o: 503.205.0610 | m: 971.207.2095

e: josh@ecacre.com 

SUMMIT LEAD

Chris Marsh

cmarsh@sdgpdx.com

PROJECT WEBSITE
220091 - Oregon City Mixed Use Entertainment Center (1).jpg
Mf Streetscape.jpg

ENTERTAINMENT, MIXED-USE

When built as proposed, we will create a vibrant and attractive gateway at Oregon City's north entrance: a place where residents and tourists will shop, dine, stroll, enjoy indoor family entertainment. The proposed development will clean up the 80-plus acre contaminated brownfield site, will create 1000’s of jobs and provide many other important economic impacts to the city and surrounding areas.
 

LOCATION

Oregon City, OR

CATEGORY

Mixed-Use Entertainment

SUMMIT LEAD

BASELINE APARTMENTS

Baseline Apartments consists of 104 market rate units in Gresham, Oregon, across four buildings and an amenity structure consisting of 98,000 GSF. Each 4-story building includes an elevator, roof deck, green roofs, and other elements bringing urban Class-A product to the suburbs. Anticipated delivery January, 2021.

 

LOCATION

Portland, OR

CATEGORY

Multi-Family 

LEASE INFO
SUMMIT LEAD-

Chris Marsh

cmarsh@sdgpdx.com

BLOCK 3

Timberhouse is an 8-story apartment building with offices and ground-level retail. Timberhouse includes 230 apartments with 2,000 square feet of retail. It will be built at Block 3 of the waterfront development, on the west side of Esther Street near Vancouver City Hall. Anticipated delivery October, 2022.

LOCATION

Vancouver, WA

CATEGORY

Multi-Family 

LEASE INFO
SUMMIT LEAD

Chrish Marsh 

cmarsh@sdgpdx.com

bottom of page